Tehnounion
logo

sale sector references

Tender Sale:

  • EPS
  • EPCG
  • Telekom Srbija
  • Mtel Crna Gora
  • NIS
  • ZIG Novi Sad
  • Delhaize
  • Airport Nikola Tesla...

Industry:

  • Lafarge
  • Michelin
  • FIAT
  • HIP Petrohemija
  • Hemofarm
  • Philip Morris
  • Gorenje
  • Calsberg...

Construction:

  • Ušće Shopping Center
  • Merkator
  • Urgentni Centar Novi Sad
  • Klinički Centar Niš
  • Airport City Beograd
  • A Blok Beograd
  • Johnson Electric...

ENGINEERING SECTOR REFERENCES

Infrastructure:

  • Smart Grid Novi Sad
  • Smart Grid Zrenjanin
  • Substation 110 kVA Sremska Mitrovica
  • Substation 110 kVA Rimski Šančevi
  • Design and installation of microprocessor protection in SS 110/20kV
  • Telecom Serbia DATA centar
  • Replacing the backup power supply (UPS and DEA) at the Airport Nikola Tesla
  • Substation 110/20kV Sombor 2 – rreconstruction of 110kV i 20kV relay protection

Industry & Installations:

  • 30 MVAr in 560 cabinets for reactive power compensation in the Electricity Distribution Facility Novi Sad
  • 2 MVAr low-voltage compensation in Koteks Viscofan Novi Sad
  • 1,3 MVAr medium-voltage compensation and 2.2 MVAr low-voltage compensation in FBC Majdanpek
  • Reconstruction and modernization of the entire plant management of Drier in Agroglob Novi Sad

Cities & Municipalities:

  • Smart Grid, Novi Sad
  • El. works in Electro distribution Ruma, Sremska Mitrovica and Valjevo
  • Remote control system in Zrenjanin and Subotica
  • Spare power supply - Aerodrom Nikola Tesla
  • Substation 2x1000kVA, 0.4/20 – Bioenergy plant, Vrbas
  • Substation 2x31.5kVA, 110/20kV, Sombor 2
  • Substation 2x31.5kVA, 110/20kV, Rimski Šančevi
  • Substation 2x31.5kVA, 110/20kV, Sremska Mitrovica
Smart Grid, Novi Sad
Installation of remotely manageable medium voltage equipment in the substation and replacement of the power dissipator on the long –distance transmission line with the sections and reclosers. Integration, monitoring of parameters and management from dispatching centers.
Electrical works in Electro distribution Ruma, Sremska Mitrovica and Valjevo
Construction of long-distance transmission lines, substations, low-voltage networks, as well as construction of new ones and relocation of existing terminals.
Remote control system in Zrenjanin and Subotica
Installation of remote control medium-voltage equipment in the substation and replacement of power dissipaters on the long- distance transmission line with reclosers. Monitoring of parameters and management from dispatch centers.
Spare power supply - Aerodrom Nikola Tesla
Replacement of the existing DEA with a new aggregate of 1250kVA and installation of UPS devices 1000kVA for terminal 2.
Substation 2x1000kVA, 0.4/20 – Bioenergy plant, Vrbas
Remote controled substation 2x1000kVA for transmission of produced electricity Power distribution in biogas plant.
Substation 2x31.5kVA, 110/20kV, Sombor 2
Works on the replacement of the protection of 110kV and 20kV, as well as the 20kV switch.
Substation 2x31.5kVA, 110/20kV, Rimski Šančevi
Installation of two 20kV medium voltage cells and expansion of relay protection.
Substation 2x31.5kVA, 110/20kV, Sremska Mitrovica
Delivery and installation of 35kV relay protection plant.
ED Novi Sad - kompenzacija reaktivne energije
30 MVAr u 560 ormana za kompenzaciju reaktivne energije u Elektrodistribuciji „Novi Sad“